A landmark Building Safety Act ruling makes manufacturers and suppliers still liable for defective products sold in the UK, even if their UK subsidiary has gone bust or they are based overseas. Anyone familiar with the trail of errors that led to the awful events at Grenfell will be aware that suppliers of cladding products appeared to adopt what could be charitably termed a relaxed attitude to fire safety compliance. We are now seeing more claims through the courts flowing down liability to the supply chain - and will see even more against product suppliers as the effects of the Building Safety Act 2022 (BSA) come to fruition. Recently, the Technology and Construction Court handed down judgment in Mulalley & Co. Ltd v Sto Ltd and Sto SE & Co. KGaA — where Mulalley obtained the first building liability order by default judgment and an 87.5% contribution from the German parent company of the cladding product manufacturer and supplier. To be clear, Sto were not the cladding suppliers at Grenfell, but the Grenfell tragedy has put a spotlight on a number of cladding manufacturers and suppliers which sold into the UK market. The decision is a particularly useful guide for anyone involved in fire safety claims, as it addresses the court’s approach to claims against product suppliers under section 149 of the BSA and the apportionment of responsibility between contractors and product manufacturers.

The dispute: Parkside Court and the StoTherm Classic system

In 2006 Chelmer Housing Partnership Limited (Chelmer) engaged Mulalley to design and construct the refurbishment and extension of Parkside Court, including the external façade of the residential tower. The supply and installation of the StoTherm Classic System was manufactured and supplied by Sto Limited (Sto UK). Chelmer subsequently identified that, amongst other issues, the cladding system was defective. In December 2022 Mulalley entered into a settlement agreement with Chelmer under which it agreed to carry out remedial works, including removal and replacement of the StoTherm Classic System, and to reimburse Chelmer certain sums. Mulalley therefore turned to Sto UK to recover those costs, bringing a contribution claim against Sto UK under the Civil Liability (Contribution) Act 1978, arising from its liability pursuant to section 149 of the BSA. It simultaneously brought a claim against Sto UK’s parent company (Sto Germany) through a building liability order under section 130 of the BSA — a mechanism specifically designed to prevent manufacturers from shielding themselves behind corporate structures or subsidiary insolvency.

This judgment relates to that quantum assessment and is the first time the court has determined the ‘just and equitable’ contribution for a cladding product supplier. Sto UK appears to have exited the UK market and was placed in voluntary administration in January 2025, resulting in a statutory moratorium on Mulalley’s claim against it. The proceedings continued against Sto Germany, which chose not to participate. In December 2025 Mulalley obtained default judgment on liability, with quantum to be determined at a subsequent hearing. This judgment relates to that quantum assessment and is the first time the court has determined the “just and equitable” contribution for a cladding product supplier. The court awarded Mulalley 87.5% of its reasonable costs incurred in stripping and replacing the defective system. This was significantly above a typical contribution award against an architect for a design breach, which ordinarily falls between 67% and 80%. Mr Justice Pepperall held that Sto UK’s position was materially different from that of an architect, as it extended beyond a design role: the supply of an inherently defective product, together with misleading marketing, warranted a higher figure. He concluded that the “principal cause of the remedial works was plainly the fact that Sto marketed and supplied an inherently defective product.” This clearly demonstrates that where a supplier’s conduct goes beyond simple design involvement, the Court will hold it significantly accountable.

What it means for the industry

For contractors or developers that have already remediated buildings or entered into settlements with owners and have to date borne the brunt of the remedial costs, this judgment offers a degree of reassurance that the costs of stepping up to do the right thing may be shared with others in their supply chain - with the level of contribution potentially recoverable far exceeding cases involving design professionals.

For contractors or developers that have already remediated buildings… this judgment offers reassurance that the costs of stepping up may be shared with others in their supply chain.

However, maintaining detailed records from the outset is essential. The court was careful to distinguish between the effect of the default judgment (which established liability) and determining the contribution of damages to be awarded.

“Notwithstanding Sto Germany’s failure to engage, the assessment is not made by default and Mulalley must prove its loss or damage by evidence”.

The court therefore considered:

  • Actual costs incurred
  • Whether those related to the defects
  • Reasonableness of those costs
  • What just and equitable contribution Sto Germany should pay

For product manufacturers and suppliers, the message is unambiguous: if you place a defective product on the market, the BSA gives the court the tools to hold you financially accountable - even if your UK subsidiary has entered administration or you are based overseas. Corporate structure will no longer provide a shield where a defective product has been placed on the UK market. This case supports parties wishing to share the burden of costs with product suppliers and depending on the circumstances suggests that the contribution of product manufacturers and suppliers will be potentially significant.

This article first appeared in Building Magazine and has been reproduced with their permission.

Continue reading from this series

England & Wales

02 Building safety update: Progress on future changes, including the recategorisation of certain higher risk building works

England & Wales

03 Building Safety Levy: What Do the Proposed 2026 Amendments Mean?

England & Wales

04 New details announced for the UK Government’s plan to ban cash retentions

England & Wales

05 Can Contractors Resist Enforcement of an Adjudicator's Decision? Lessons from Kingsmead Homes v Laycock Mechanical Services [2025]

England & Wales

06 Beware the “late invoice” clause: TCC confirms the final date for payment must be fixed to the due date

England & Wales

07 Mace Construct Ltd v Baltic Investment Holdings Ltd: A case highlighting the risk of including tender clarifications and schedules of derogations in building contracts

England & Wales

08 A New Consenting Landscape for Major Water Infrastructure Projects

England & Wales

09 Ofgem proposes to increase costs and tighten grid connection procedures for larger data centre projects

International

01 Arbitrating Construction Disputes – Comparing the ICC, LCIA, SIAC and SCCA Rules

International

02 Back-to-back is not enough: UAE construction subcontracts and multiparty arbitration under the 2026 ICC Rules

International

03 Decennial Liability and Subcontractors under the New UAE Civil Code: Articles 821 to 824

International

04 Enhanced Remedies for Defective Work under the New UAE Civil Code: Article 818

International

05 Liquidated Damages and Pre-Agreed Compensation under the New UAE Civil Code: Article 340

International

06 Hardship and Lump-Sum Price Adjustments under the New UAE Civil Code: Articles 224 and 829

Cover

Keep reading

About the Construction, Engineering & Projects Group

Keep reading

Alumni • Legal Notices • Accessibility • Privacy Notice • Fraudulent or 'scam' communication • Complaints Procedure • Pricing Information

© Charles Russell Speechlys 2026. Solicitors Regulation Authority number 420625.