What is the Building Safety Levy?
The Building Safety Levy is a new charge on major residential developments in England, established under powers in the Building Safety Act 2022 with detailed rules in the Building Safety Levy (England) Regulations 2025. It is expected to raise approximately £3.4 billion towards remediation costs over the next ten years.
Where does the Building Safety Levy apply?
This Building Safety Levy will only apply in England.
The Scottish building safety levy is planned to take effect in April 2028 under separate legislation, the Building Safety Levy (Scotland) Act 2026. It is intended to raise between £360 million and £450 million over its 15 year period to provide funding for Scotland’s cladding remediation programme.
When does the Building Safety Levy come into effect?
In England, the levy came into effect on 1 October 2026. Building control applications and initial notices submitted before that date (including where subsequently varied by an amendment notice or change control application) were not subject to the levy.
It applies where:
- The works create new residential floorspace;
- The works are, or form part of, a “major residential development”; and
- The client is not an exempt person.
A “major residential development” means at least 10 new dwellings, or 30 new bedspaces for purpose-built student accommodation (PBSA). For works to existing buildings (conversions, changes of use or extensions), existing dwellings or bedspaces are disregarded both for the threshold and the calculation.
Whether works form part of a wider development is determined by the planning permission, to prevent attempts to avoid the levy by splitting a development into multiple building control applications below the threshold.
Which developments are exempt from the Building Safety Levy?
Social housing and supported housing are exempt, as are non-profit registered providers of social housing and their wholly owned subsidiaries. Shared ownership dwellings and dwellings sold at first and subsequently for no more than 70% of market value can also qualify.
Other exempt accommodation includes:
- School accommodation, children’s homes, care homes and hospitals;
- Secure residential institutions, accommodation for victims of domestic abuse, and temporary accommodation for homeless people;
- Hotels, hostels, religious establishments and almshouses.
When does the Building Safety Levy come into effect?
Rates vary by local authority area and are charged per square metre of Gross Internal Area. Illustrative rates include £100.35 per sqm in Kensington and Chelsea, £71.51 in Hackney, £50.87 in Cambridge, £24.57 in Leeds and £13.11 in Pendle. Developers operating within London and other wealthier areas should therefore expect to pay significantly more.
Chargeable floorspace includes accommodation floorspace plus communal floorspace (stairways, lobbies, landings, plant rooms and other areas solely for occupants); a significant point for schemes with large communal areas such as BTR, PBSA and retirement living.
A 50% brownfield discount applies where at least 75% of the land satisfies the previously developed condition, incentivising brownfield development.
Who pays the Building Safety Levy?
The client is liable to pay; where there is more than one named client, each is jointly liable.
How is the Building Safety Levy charged?
The levy is charged through the local authority. To establish if the levy charging conditions apply and if there is an exemption:
- Initial levy information must accompany the building control application, initial notice or, for higher risk buildings, the gateway 2 application.
- Levy charging information is then provided at the time of issue of the commencement notice.
- Once the local authority has determined if the levy is due, it will either issue a levy liability notice or a notice of no charge.
- Where applicable, payment is due by the earlier of the ‘completion notice date’ and first occupation (disregarding any continuously occupied parts). No completion certificate or final certificate will be issued without payment. A review can be requested, with a right of appeal to the First-tier Tribunal.
The Government’s detailed guidance is available here. The exact process varies, depending upon the building control route (See process maps).

What about gateway 2 applications that were submitted before 1 October 2026?
Developers who submitted gateway 2 applications for higher risk building works before 1 October 2026, hoping to avoid the levy, will need to see them approved. For voided or rejected applications resubmitted on or after that date, the Regulations now apply. The latest data (12 weeks to 31 August 2026) shows a promising 92% approval rate for new build gateway 2 applications.
Next steps
These continue to be challenging times for the industry, with developers also facing additional costs from:
- The two staircase requirement which came into force on 30 September 2026, targeting residential buildings of 18 metres or more (subject to transitional arrangements), and
- The Future Homes and Buildings Standards due 24 March 2027 (again subject to transitional arrangements).
Developers will no doubt be reviewing their pipelines to assess which schemes will be subject to the levy, which may benefit from the 50% discount, and factor the charge into their appraisals.
There should be some good news ahead for housebuilders in London, with a consultation having closed in September 2026 on proposed regulations to implement a new, time-limited relief from borough level Community Infrastructure Levy for qualifying developments in Greater London.
Practical steps which can be taken now include:
- Auditing the composition of workforces and the logistics of carrying out checks across the wider group of individuals caught by the new regime.
- Identifying where non-employee labour is used.
- Reviewing onboarding processes.
- Assessing the robustness of their relationships with third-party suppliers.
- Reviewing staffing agency agreements to ensure they include express terms requiring agencies to carry out right to work checks on all individuals supplied and to provide evidence that such checks have been completed.